Weekly Update 12/1/2020
December 1, 2020
Due to the Thanksgiving Holiday, work last week occurred Monday through Wednesday. Huston Electric was onsite to begin installing the street signs, and 3D Company performed a video inspection of the newly installed stormwater system throughout the project. This week (November 30 – December 4) will see Huston Electric onsite again to finish the installation […]
Read MoreWeekly Update 11/24/2020
November 24, 2020
Crews are transitioning to the final details for Phase 3 of the Streetscapes Project for Downtown Lafayette! Last week (November 16 – November 20) saw the completion of the asphalt paving, as well as concrete crews cutting around the storm structure castings to adjust them, then pour concrete around the structures. With the completion of […]
Read MoreWeekly Update 11/17/2020
November 17, 2020
Last week (November 9 – November 13) began the asphalt paving process along N. 10th and Main Streets. Huston Electric was onsite pulling wire through the electrical conduit on N. 10th Street. The new sidewalk and curb along 10th St. between Main and Columbia Streets were installed by Decorative Paving. This week (November 16 – […]
Read MoreWeekly Update 11/10/2020
November 10, 2020
Concrete work continued last week (November 2 – 6) with the formation and pouring of the curb and gutter along the east side of N. 10th Street, followed by the formation and pouring of the new sidewalk along the east side of N. 10th St. between Main and Columbia Streets. The curb ramps on the […]
Read MoreWeekly Update 11/3/2020
November 3, 2020
Last week, (October 26 – October 30) saw the continuation of concrete work for Phase 3 of the Streetscapes Project for Downtown Lafayette. Work consisted of forming and pouring the curb and gutter along the east side of N. 10th Street, then continuing to pour the sidewalk along N. 10th Street between Main and Columbia […]
Read MoreWeekly Update 10/27/2020
October 27, 2020
Work continues throughout Phase 3 of the Streetscapes Project for Downtown Lafayette. This past week (October 19 – 23) saw the installation of safe temporary stone access points for residents and businesses. Huston Electric installed the electrical conduit on N. 10th Street, and also installed the streetlights along Main Street. The curb and gutter on […]
Read MoreWeekly Update 10/20/2020
October 20, 2020
Last week, (October 12 – 16) saw the installation of safe temporary stone access points for residents and businesses on N. 10th St. since the old sidewalk was removed. Additional concrete work was conducted with the forming and pouring of the curb and gutter on the west side of N. 10th Street. Other progress included […]
Read MoreWeekly Update 10/13/2020
October 13, 2020
This past week, (October 5 – 9) saw crews finish the removal of old roadway and sidewalk along N 10th Street between Columbia and Main Streets. The curb and gutter were also formed and poured. Sanitary work was conducted by T-Bird Design Services Corporation. Huston Electric was onsite to install an electrical conduit on N. […]
Read MoreWeekly Update 10/6/2020
October 6, 2020
Last week, (September 28 – October 2) saw crews move over to the north side of Main Street between 9th and 10th Streets. In that section, they installed temporary stone access points for residents and businesses once the old sidewalk was removed. Concrete was poured for the curb and gutter along the north side of […]
Read MoreWeekly Update 9/29/20
September 29, 2020
After moving to the north side of Main St., crews poured the curb and gutter last week (September 21 – 26)! This was followed by the formation and pouring of the paver restraint bands on that same north side of Main Street. New street lighting was installed by Huston Electric. Other concrete work included the […]
Read More